Neware Technology Limited 86--18689201545 Support@battery-cyclers.com
Capacity Screening Battery And Cell Test Equipment 30V 60A Neware Battery Tester Manual

Capacity Screening Battery And Cell Test Equipment 30V 60A Neware Battery Tester Manual

  • High Light

    neware battery tester manual

    ,

    30V neware battery tester manual

    ,

    neware Battery And Cell Test Equipment

  • Voltage Range
    150mV - 30V
  • Current Range
    300mA - 60A
  • Input Power
    4861W
  • Min Voltage Resolution
    60mV
  • Min Current Resolution
    120mA
  • Channel Number
    2
  • Place of Origin
    China
  • Brand Name
    Neware
  • Certification
    CE
  • Model Number
    CT-4002-30V60A-NA
  • Minimum Order Quantity
    1 Unit
  • Price
    USD negotiation per Unit
  • Packaging Details
    wooden box
  • Delivery Time
    45 word days
  • Payment Terms
    T/T
  • Supply Ability
    10 Units Per Month

Capacity Screening Battery And Cell Test Equipment 30V 60A Neware Battery Tester Manual

Neware 30V60A Battery Grading System Battery Capacity Screening Tester

 

1 . Based on Neware fifth - generation testing system . Mainly used in Power battery condition simulation , Pulse charging and discharging , Cycle Life , Rate of charge and discharge .

 

2 . Using dynamic power or current waveform to simulate electric vehicle driving road . Simulate the electric vehicle driving road conditions through the dynamic power or current waveform .

 

3 . Battery researchers and scientists , battery manufactures , importers and exporters , you can always choose the most appropriate Neware battery testers for battery quality check , battery performance tests , battery material research , and battery mass production lines .

 

4 . CT-4000 mainly applies for institutions , colleges and universities and EV battery manufacturers .

 

5 . Recycle Battery Function

If you have recovery battery pack , like Toyota Prius battery pack , generally, each piece has 6 single Ni - MH cell , then several pieces batteries assembed in one pack , and you need to check each single cell for capacity , cyclie life , resistance , etc . Then assemble the battery cell after sorting by capacity , resistance . You will get the new battery pack . And last you will test the battery pack to check the real capacity and other function parameter . 

 

 

6 . Simulation - the Way You Look into Reality

You know battery capacity at at constant current , or power , or load . But the reality is that no the energy is drawn by a constant variable . Your capacity or energy tested under constant conditions can only be a general one , and the cycle life tested such regime can also be largely deviated from reality . To have a better master of reality, simulation is introduced . GSM pulse is of such kind for phone batteries . for EV batteries , Drive Cycle Simulation is used .

 

7 . Driving Cycle Simulation

Driving cycles are used to simulate car fuel economy at different operating conditions . There are many driving schedules or driving cycles that are issued by various agencies or institutes. To simulate EV , you need to convert the speed output into the power consumption or regeneration of the energy storage device installed on the vehicle .

 

8 . Accurate Timing

Most of us are considering the voltage and current accuracies are the all important factors of a battery tester , but actually timing accuracy is of the same importance .

 

9 . Capacity or energy is calculated on time basis with the voltage and current measured , thus the timing accuracy will greatly affect the capacity calculated . To a general constant current or other constant testing regimes, this effect may not that easy to be observed . 

 

Project index

Parameter index

resolution AD 16bit , DA 16bit
Input Resistance More than 1MΩ
Input Power 4861W
Channel Features Constant Current Source and Constant Voltage Source with Independent pairs of Closed - loop Structure
Channel Control Mode Independent Control
Voltage Per Channel Voltage Range 150mV - 30V
Discharge Min Voltage 3V
Accuracy 0.05 percent of FS
Stability 0.05 percent of FS
Time Current Response Time 20ms
Charge Charge Mode CCCharge , CVCharge , CCCVCharge , CPCharge
End Conditon Voltage , Current , Relative Time , Capacity , -deltaV
Discharge Discharge Mode CCD , CPD , CRD
End Condition Voltage , Current , Relative Time , Capacity
Protection Software Protection Power - down Data Protection
Off - line Testing Function
Setting Protection Condition,Setting Parameter - Low Voltage limit , Upper Voltage limit , Low Current limit , Upper Current limit , Delay Time
IP protection level Protection level IP20
Voltage and Current Testing Sample 4 - wire connecting
Noise Less than 85dB
Database MySQL Database
A Means of Communication of Upper Machine TCP / IP Protocol
Data Output EXCEL , TXT , Graph
Communication Interface Ethernet Port
Per Unit Main Channels No. 144

 

Capacity Screening Battery And Cell Test Equipment 30V 60A Neware Battery Tester Manual 0